Monday May 6th       

  • Full closure on Hazleton Ave for Mobile pump and concrete staging (9am-3pm) Permits have been issued by city of Toronto and traffic will be redirected to Webster ave.

    1. No other major deliveries scheduled for Hazelton ave.

  • Tuesday May 7th      

  • Wide load formwork delivery to site on Hazelton ave between (6:00am-7:00am) Traffic on Hazelton ave will be temporarily redirected to Webster ave.

    1. 1 Load of reinforcing steel will be hoisted from Hazelton ave between 9am-10:00am. Hazelton ave Traffic will be temporarily redirected to webster ave.

    2. 1 Load of concrete will reverse into the site from Davenport between (3:00pm-4pm) no planned closure on Hazelton ave.

    3. No other major deliveries scheduled for Hazelton ave.

  • Wednesday May 8th

  • 3 Loads of concrete will reverse into the site from Davenport between (3:00pm-5pm)

    1. Full closure (9am-3pm) for Pre-cast panel installation will continue daily on Davenport rd. and Hazelton ave. Eastbound curb lane to be closed as approved by the city of Toronto. Paid duty officers will be present and the ramp to the Dakota building to the west to be open at all times. (See attached Pre-cast panel installation setup plans)  

  • Thursday May 9th     

  • 3 Loads of concrete will reverse into the site from Davenport between (3:00pm-5pm) no planned closure on Hazelton ave.

    1. No other major deliveries scheduled for Hazelton ave.

  • Friday May 10th  

  • Full closure (9am-3pm) for Pre-cast panel installation will continue daily on Davenport rd. and Hazelton ave. Eastbound curb lane to be closed as approved by the city of Toronto. Paid duty officers will be present and the ramp to the Dakota building to the west to be open at all times. (See attached Pre-cast panel installation setup plans)  

    1. Load our formwork material from Hazelton ave between 10am-1pm

    2. 1 Load of concrete will reverse into the site from Davenport between (2:00pm-4:0pm)

    3. No other major deliveries scheduled for Hazelton ave

    4. No lane closure on Davenport rd.

  • Expect periodic deliveries into the site from the corner of Hazelton and Davenport for the balance of the days not listed above.

  • Regular working hours onsite will be starting at 7am to 5pm daily

 Thank you for your ongoing patience and cooperation.

Jamie Zavitz | Project Superintendent

CLARK CONSTRUCTION MANAGEMENT INC.

387124 20th Sideroad | Mono, ON L9W 6V5 | cell (647) 290-2244 | email jzavitz@clarkcm.ca